Permitting Support for Construction

Permits are slow, dull and easy to get wrong, and a consultant or builder who knows your county can save a farm project months of delay.

Land, Fencing & Construction Services3 min read654 words

In short

  • Call the county and state offices first and write down what they say.
  • Pin down in the contract who pulls permits, pays fees and handles corrections.
  • Never start work before approval, however routine the project looks.

Know what permits might apply

A single farm building can touch several offices. There may be a building or zoning permit from the county, an electrical or plumbing permit, a septic or well permit from the health department, a stormwater or erosion permit, a floodplain review, a driveway permit from the road authority, and a livestock facility permit from a state agency. Some places exempt agricultural buildings from some of these, and others do not. Rules vary by state and county, so start by calling the county planning or building office and asking what applies to your project and your zoning.

Do it yourself or hire help

A builder or contractor can often pull the permits as part of the job. Engineers, planners, permit expediters and ag consultants can also prepare applications, drawings and environmental reports. Ask what experience they have in your county, and ask for references from recent farm projects. Ask exactly what is included: preparing forms, attending hearings, answering agency questions, revising drawings. Ask what happens if a permit is denied or delayed. Ask who pays for revised drawings, and whether the fee is charged by the hour or as a flat amount. Be wary of any promise of a guaranteed approval, since no private party controls a public agency.

Ask the agency the right questions

Before spending money on plans, call or visit the agency and ask in plain terms. What permits are needed for this building? What drawings or site plans do you require? What are the setbacks from property lines, roads, wells and streams? What are the fees, and how long does review take? Who inspects, and when? Write down the name of the person you spoke to and the date. Verbal answers from a counter clerk can change. Ask for the requirements in writing or on the agency website, and keep a copy.

Livestock and environmental approvals

Larger livestock operations, manure storage, feedlots and operations near water often have extra review. These rules may be handled by the state department of agriculture, the environmental agency or both, and in some areas by the county. Thresholds and requirements vary. Ask the agency whether your herd size, location or planned expansion triggers anything. Neighbors may also have a chance to comment in some places, so ask how public notice works. A good consultant will tell you early about the slow steps so they can be started first. Ask for a written list of each approval, the office that issues it, the fee and the expected review time, so you can see where the project will sit waiting.

Timing and sequencing

Permits can take weeks or months, and some steps must come before others. A soil evaluation might come before a septic permit, and a septic permit before a building permit. Ask your builder for a timeline that shows the permit steps and where the construction crew waits. Do not let anyone start work before approval, even if it seems routine. A stop-work order, fines or a forced tear-out cost far more than the wait. If you are financing the project, ask your lender what it needs to see and when.

Who is responsible

Whoever signs the application is generally responsible for what it says. Read it before it goes in, check that dimensions, uses and site details are accurate, and keep copies of everything submitted. In your contract, say who pulls each permit, who pays the fees, who schedules inspections and who handles corrections. Ask your insurance agent how unpermitted or noncompliant work could affect coverage. Keep every approval, inspection record and final sign-off in one folder with the plans. Look up your state in the directory for contractors and consultants who handle permits.