In short
- Handle topsoil and wet-soil compaction in the written agreement.
- Call your conservation district and the state water agency before moving dirt.
- Locate tile and utilities first and decide who pays for surprises.
Say what you want the ground to do
Good grading starts with a goal: move water off a feedlot, build a pad for a shop, fix a wet spot in a field, put in a lane, a pond or a terrace. Walk the site with the contractor and point out where water runs after a hard rain. Ask them to explain how the finished surface will drain and where the water goes next. Ask the same of any contractor you consider. If it goes onto the neighbor's land or into a stream, you may have a legal and regulatory problem. Take photos before work starts so you have a record of the ground as it was. Mark the edges of the work area with flags or stakes so everyone sees the same boundaries, and ask the contractor to confirm the plan in writing before the first pass.
Topsoil is the whole point
On crop ground, how the topsoil is stripped, stockpiled and replaced makes the difference between a good field and a poor one. Ask the contractor to keep topsoil separate from subsoil and to put it back on top. Ask how they will avoid running heavy machines on wet soil, because compaction from scrapers and loaded trucks can cut yields for years. A contractor who only talks about hours and loads and never about soil is doing the cheap part of the job. Your Extension office or conservation district can describe what is reasonable for your soil.
Equipment, rates and how time is counted
Contractors may charge by the hour, by the yard moved or by the job. Ask whether the hourly rate includes the operator, fuel, moving the machine to your place and back, and truck time. Ask how they count travel and standby time. Ask what machines will be on the job and whether the operators have run similar work. Custom rates vary by region and by machine, so check with a university Extension rate survey to see the general range. A fixed price helps with budgeting but should spell out what happens if the dirt turns out to be rock or mud.
Permits, wetlands and water
Moving a lot of dirt may need permits. Rules can cover floodplains, wetlands, streams, stormwater, ponds and dams, and they vary by state and county. Before work begins, call your county conservation district, the state agency that handles water, and the local USDA service center. Farmers in federal programs should ask whether the work could affect program eligibility, especially on wetland or highly erodible ground. A contractor who says permits are your problem should still know what the local rules are. Do not start a pond or ditch job until you have those answers.
Utilities, tile and surprises
Before any digging, call the one-call utility locating service. Ask the contractor to locate field tile and flag it, since cutting a main can flood a neighbor or drown a crop. If you have maps of drainage tile, hand them over. Ask who repairs damaged tile and how. Ask what happens if the crew finds old buried junk, rock or a spring. Put your answers into the contract. Surprises are normal in dirt work, and the question is only who pays for them.
The contract and the finish
The agreement should name the work area, the finished grades or slopes, topsoil handling, seeding or cover, the rate or price, dates and who does cleanup. Ask for liability insurance and a workers compensation certificate, and confirm requirements with your own insurance agent. Plan on seeding or mulching bare soil quickly, since fresh fill washes out easily. Walk the job after the first heavy rain and write down anything that holds water or washes. Look up your state in the directory for excavating and grading contractors.