Building a bin is a ten-year decision made in a hurry. Here is how to compare builders, read a quote, and avoid the common problems that show up after the first harvest.

Grain Storage, Drying & Elevator Services3 min read665 words

In short

  • Size the bin from your own yields and holding plan, then match the handling equipment to it.
  • Compare bids line by line, and get engineering, warranty and insurance documents in hand.
  • Tie payments to milestones and hold back the last payment until the bin runs properly.

Start With the Capacity You Actually Need

Contractors will happily sell you the biggest bin your site can hold. Begin instead with your own numbers: average yield, acres, and how much of the crop you will realistically hold past harvest. A farm planting 1,000 acres of corn at 180 bushels per acre produces 180,000 bushels. If you want to hold half, you need space for 90,000 bushels, not 180,000. Add a margin for a good year, but write down the reason for every extra bushel. Think also about handling rate. A big bin with a slow leg and a small dryer just moves the traffic jam from the elevator to your yard.

Site, Soil and Utilities

A bin is heavy and it concentrates its weight on a ring of footing and a floor. Poor soil, a high water table or fill dirt that was never compacted can cause settling and cracked floors. Ask the builder who is responsible for soil testing or a geotechnical recommendation and whether the foundation is designed by a licensed engineer. Check where the power comes from, since a dryer, fans and a leg draw a lot of load, and the utility may need weeks to run a new service. Also think about truck turning room, overhead lines, and where wet corn will sit while it waits.

Reading a Bid

Two quotes labeled bin package can cover very different things. Make a list of items and see who includes what: foundation, floor and aeration ducting, stiffening, roof vents, ladders and safety cages, sweep augers, unload systems, temperature cables, electrical, leg and distributors, dryer connections, and site cleanup. Ask whether the price includes freight, erection labor, permits and sales tax. Ask whether the bin is built by the manufacturer's own crew or by a subcontractor. Request the manufacturer's engineering documents and warranty terms, not just a summary. Lowest price often means a few lines are missing, not that the builder is cheaper.

Permits, Codes and Safety Rules

Local rules differ. Some counties require building or electrical permits for agricultural structures, others exempt them, and setback rules or floodplain limits can apply. Confirm with the county zoning office before you sign anything. Your insurance carrier may also want to know about a new bin and its wiring, and a lender may want the plan for financing it. Bins bring confined-space and engulfment hazards, so ask the builder what ladders, lifelines and lockout points are included. Review guidance from your state Extension or a farm safety program before the first load goes in.

Vetting the Builder

Ask for a list of recent customers within driving distance and actually call a few. Ask what went wrong and how it was handled. Visit a bin the crew built two or three seasons ago. Look at the floor, the roof seams and the doors. Confirm that the crew carries workers' compensation and liability coverage and ask for a certificate of insurance that names you. Ask how many projects they have underway and how a delay in steel delivery would be handled. A builder who cannot say when the crew will arrive probably does not know either.

Contract and Payment Terms

Put the schedule, scope, and payment steps in a written contract. Tie each payment to a milestone you can see, such as footing poured, steel on site, bin standing, and electrical inspected. Hold back a final payment until a punch list is done and you have run the bin empty and then with grain. Keep the manufacturer's warranty paperwork and any lien waivers from suppliers. Rules on liens and contractor licensing vary by state, so confirm with your attorney or your state contractor licensing office.